净化和处理

废水净化始终是一个激动人心的挑战。了解受体环境,分析水体可接受的处理方法,制定处理流程,绘制处理厂图纸并选择施工方法都是我们的工程师熟悉并了解的。我们所创造的价值源自我们全部的认知,也源自我们各行业的工程师之间持续的交流以及他们开展的横向合作。

References

Left Right
  • ancienne_step_st_hilaire_du_touvet
    Pré Lacour waste water treatment plant in Saint-Hilaire du Touvet

    Construction management services for a new waste water treatment plant at Pré Lacour in Saint Hilaire du Touvet:
    - Demolition of the existing waste water treatment plant (photo)
    - Construction of a new waste water treatment plant using rotating biological contactor technology. 1,900 P.E.; Administrative authorisation documents.
    Client: Régie de l’Eau et de l’Assainissement de Saint-Hilaire du Touvet

    Google map
  • step_la_plagne
    Aime Wastewater Treatment Plant, La Plagne

    Complete project design and supervision services for extending the wastewater treatment plant and the activated sludge unit and ensuring their compliance with current standards. Capacity of 60,000 PE.
    Partner: IRH
    Client: Syndicat Intercommunal de la Grande Plagne (SIGP)

    Google map
  • assainissement_serrieres
    Sewerage of the Félines, Limony, Peyraud and Serrières districts

    Study to redefine the sewerage network in the Félines, Limony, Peyraud and Serrières districts.
    Client: Serrières municipality

    Google map
  • assainissement_nevers
    Sewerage of the Nevers urban area

    Assistance with preparing, drawing up, and monitoring the implementation of a sewerage master plan in the Nevers urban area.
    Client: Nevers local authorities

    Google map
  • step_castelnaudary
    Castelnaudary Wastewater Treatment Plant

    Complete project design and supervision services for the extension and rehabilitation of a wastewater treatment plant with a capacity of 47,000 PE. Activated sludge treatment process.
    Client: Castelnaudary municipality

    Google map
  • step_cluny
    Cluny Wastewater Treatment Plant

    Complete project design and supervision services for the construction of a new wastewater treatment plant (6500 PE): activated sludge and sludge dehydration on marcophyte beds. Effluent transfer.
    Client: Cluny municipality

    Google map
  • step_montceau
    Montceau-les-Mines Wastewater Treatment Plant

    Management services on behalf of the Owner to ensure plant compliance with current standards (35,000 PE). Sludge and odour treatment.
    Client: Communauté Urbaine du Creusot-Montceau

    Google map
  • station_epuration_torcy
    Torcy et Blanzy Wastewater Treatment Plants

    Complete project design and supervision services for the extension of wastewater treatment plants in Torcy (60,000 PE) and Blanzy (25,000 PE), as well as ensuring their compliance with current standards.
    Client: Communauté Urbaine du Creusot-Montceau

    Google map
  • station_epuration_le_touvet
    Le Touvet Wastewater Treatment Plant

    Design, construction and supervision of Le Touvet wastewater treatment plant with a capaicty of 18,000 PE.
    Activated sludge treatment, biological treatment of fats, solar drying of sludge.
    Client: Syndicat d’Assainissement des Iles (SADI)

    Google map
  • station_epuration_bourg_argental
    Bourg-Argental Wastewater Treatment Plant

    Complete project design and supervision services for the construction of a new wastewater treatment plant (4500 PE), activated sludge process and sludge treatment on macrophyte beds. Channelling of effluent transfer and pollution basin.
    Loi sur l’Eau” report (French legislation on water and the environment).
    Client : Bourg-Argental district authorities

    Google map
  • Clarificateur Dijon
    Dijon-Longvic Wastewater Treatment Plant

    Engineering services for water and sludge treatment processes. Reconstruction of the wastewater treatment plant (400,000 PE). Upgrading of water treatment process to be compliant with current standards.
    Adaptation of sludge treatment process: thickening / stabilisation / dehydration / drying / incineration.
    Partner: Sogreah
    Client: Lyonnaise des Eaux

    Google map
  • station_epuration_fourchambault
    Fourchambault Wastewater Treatment Plant

    Engineering services to make the plant compliant with current standards (15,000 PE).
    Activated sludge subjected to prolonged aeration, sludge centrifugation.
    Effluent transfer. “Loi sur l’Eau” report (French legislation on water and the environment).
    Client: Nevers local authorities

    Google map
  • station_epuration_grenoble
    Aquapole Wastewater Treatment Plant, Grenoble

    Management of works contracts and assistance to the owner for acceptance formalities: extension of the biological treatment capacity of the plant.
    Industrial effluent accounting for 1/5th of input.
    Client: Grenoble Alpes Métropole (METRO)

    Google map
  • station_epuration_marcigny
    Marcigny Wastewater Treatment Plant

    Complete project design and supervision services for the construction of Marcigny wastewater treatment plant (3400 PE).
    Activated sludge and sludge dehydration on marcophyte beds prior to pumping.
    Effluent transfer.
    Loi sur l’Eau” report (French legislation on water and the environment).
    Client: Marcigny municipality

    Google map