水力发电
GIRUS公司靠近“白色煤炭”技术的摇篮。那么,这是我们的工程师团队对水力发电表现出浓厚兴趣的原因吗?也许是的,但这更多是源于水力发电所需要的和我们团队乐于分享的行业间的联合。能源行业和水行业简单且原始的联合,要求一定的专业技术和对环境因素的考虑。我们有能力帮助您使水资源成为一种参照能源。
References
-

Mini-hydroplant on Le Bourget du Lac drinking water network
Project design and supervision services for the construction of two mini-hydropower plants on the Bourget du Lac drinking water network. Study of several scenarios for power ratings between 10 and 50 kW.
Google map
Client: Le Bourget du Lac district -

Argentine II mini-hydroplant
Project design and supervision services and application for planning permission.
Google map
Rated discharge: 1.1 m³/s
Net head: 454 m
Installed capacity: 4 MW
1500m long, 750 mm diameter penstock
Three jet Pelton turbines
Client: EREMA -

Gavet Hydropower Plant
Design and construction monitoring services in the mechanical and civil engineering fields for a hydropower generation project.
Google map
Access roads for the Gavet hydropower project. Les Ponants Bridge.
Client: EDF -

La Combe de Lancey Mini-hydroplant
Expert appraisal and preliminary design of renovation work for the Saint-Mury water intake on the Vorz torrent.
Google map
750 l/s surface water intake of, 3 MW capacity power plant.
Client: Houille Blanche de Belledonne -

Le Bacheux Mini-hydroplant
Partial project design and supervision services for the construction of a hydropower plant turbining water from Le Bacheaux torrent in the Saint-Alban-des-Villards and Saint-Etienne-de-Cuines districts in Savoie (France).
Google map
Client: SEM “Les Forces du Bacheux” -

Lignarre Valley Mini-hydroplant
Project design and supervision services and application for planning permission to construct a mini-hydropower plant in the Lignarre valley. Maximum rated discharge: 2.4 m³/s. Commissioning discharge: 1.7 m³/s. Commissioning installed capacity: 1 MW. Shutter dam: water intake with screen and sand trap. Francis turbine (x2) + 1 Banki turbine. 450 m long, 900 mm diameter penstock.
Google map
Architecture Énergie – Philippe Caire
Client: Isère Énergie