收集工作的组织
废弃物的收集工作需注重务实。收集时必须了解如何使用现代运输和物流手段。它也涉及到员工团队的管理以及工作安排和安全措施方面最新理念的整合。其它重要事项还包括财税状况和营业收入预算。
GIRUS公司将参与上述全部领域并在收集工作的组织,实施,尤其是优化软件开发方面对地方当局提供支持。我司的任务是参与确认该区域的功能障碍并制定相应的纠正方案。废弃物的收集必须具有创新性以满足今后在城市规划方面的需求。
在地下堆埋,气动收集管网,车载称重,自动化收集,地理位置定位和导航方面,我司也可与您一道进行分析。
References
-

Besançon (France)
Assistance to the owner over a four-year period to roll out incentive charging. Contracting procedures for collection in the outskirts, containerisation, and the procurement of trucks and identification, dynamic weighing and geo-location equipment. Dimensional design of the Collection Information System. Organisation of collections in the outskirts where the service its newly outsourced.
Google map
Client: CA du Grand Besançon -

Paris (France)
Study of the possibilities for contracting out to a specialist operator the design, implementation and temporary operation of a pneumatic household waste collection system in the Batignolles mixed development zone.
Google map
Client: Paris city council -

Lannion (22)
The Lannion-Trégor area consists of 20 communes with a population of 31,000, and is responsible for the prevention and collection of assimilated household waste. Our assignment consisted of three separate aims and stages:assessment and characterisation of the current situation, study to optimise the system and compare different potential scenarios, definition of a new system of organisation and financial impacts of the chosen scenario, and designs for collection routes. Client: Lannion-Trégor urban district council
Google map -

Argentan region
The Argentan regional SITCOM provides services to 99 communes, with a population of 42,657. It is responsible for the prevention, collection, recovery and treatment of household and assimilated waste. The objectives of the assignment were the following: study to reorganise collection routes in the area, asses- sment of investment and operational costs of the new organisation, drawing up of an implementation schedule for the transition from the current organisation to the new one over a 4 year period.
Google map
Client: SITCOM Région d’Argentan -

Lannion (22)
The Lannion-Trégor area consists of 20 communes with a population of 31,000, and is responsible for the prevention and collection of assimilated household waste. Our assignment consisted of three separate aims and stages:assessment and characterisation of the current situation, study to optimise the system and compare different potential scenarios, definition of a new system of organisation and financial impacts of the chosen scenario, and designs for collection routes. Client: Lannion-Trégor urban district council
Google map -

Dijon (France)
Assistance with waste management contract award (pre-collection, collection and sorting centre management) – 250,000 inhab.
Google map
Client: CA du Grand Dijon -

Pezenas (France)
Waste management optimisation study: review, assessment and evaluation of possibilities for optimisation. 46 communes representing 110,000 inhabitants in semi-rural, rural and tourist areas. Study using the “E-Coûts” software.
Google map
Client: SICTOM de Pezenas -

La Plaine de l’Ain (01)
Study to optimise waste management:
Google map
– assessment and characterisation of the current waste management system,
– study to reorganise collection routes,
– preliminary study for the implementation of an incentive charging system.
Population: 50,000
Client : Plaine de l’Ain district council -

Villeurbanne (France)
Assistance with the award of waste management contracts (pre-collection, collection and sorting centre management) – population 250,000.
Google map
Client: Grand Dijon urban district council -

Châtellerault (France)
Study to optimise household waste collection in the CAPC catchment area (Communauté d’agglomération du Pays Châtelleraudais) including a preliminary assessment stage with GPS monitoring.
Google map
12 communes with a total population of 55,000.
– Dimensional design of a transfer platform,
– Reorganisation of collection routes.
Client: Pays Châtelleraudais urban district council -

Châtellerault (France)
Study to optimise household waste collection in the CAPC catchment area (Communauté d’agglomération du Pays Châtelleraudais) including a preliminary assessment stage with GPS monitoring.
Google map
12 communes with a total population of 55,000.
– Dimensional design of a transfer platform,
– Reorganisation of collection routes.
Client: Pays Châtelleraudais urban district council