Accueil › Domenii de activitate › Apa › Asanarea si tratarea
Asanarea si tratarea
Asanarea apelor este de fiecare data o provocare pasionanta. Cunoasterea mediului receptor, analizarea din perspectiva a ceea ce poate accepta grefarea unei modificari a modului de tratare, elaborarea unui lant de procedee, formularea planurilor de lucru si alegerea modalitatilor de constructie, sunt etape pe care inginerii nostri stiu sa si le imparta. Aducem un plus de valoare din cunoasterea noastra globala, integratoare, din dialogul permanent intre inginerii de diferite specialitati, din exersarea relatiilor transversale de munca.
Quelques références
-

Pré Lacour waste water treatment plant in Saint-Hilaire du Touvet
Construction management services for a new waste water treatment plant at Pré Lacour in Saint Hilaire du Touvet:
Google map
- Demolition of the existing waste water treatment plant (photo)
- Construction of a new waste water treatment plant using rotating biological contactor technology. 1,900 P.E.; Administrative authorisation documents.
Client: Régie de l’Eau et de l’Assainissement de Saint-Hilaire du Touvet -

Aime Wastewater Treatment Plant, La Plagne
Complete project design and supervision services for extending the wastewater treatment plant and the activated sludge unit and ensuring their compliance with current standards. Capacity of 60,000 PE.
Google map
Partner: IRH
Client: Syndicat Intercommunal de la Grande Plagne (SIGP) -

Sewerage of the Félines, Limony, Peyraud and Serrières districts
Study to redefine the sewerage network in the Félines, Limony, Peyraud and Serrières districts.
Google map
Client: Serrières municipality -

Sewerage of the Nevers urban area
Assistance with preparing, drawing up, and monitoring the implementation of a sewerage master plan in the Nevers urban area.
Google map
Client: Nevers local authorities -

Castelnaudary Wastewater Treatment Plant
Complete project design and supervision services for the extension and rehabilitation of a wastewater treatment plant with a capacity of 47,000 PE. Activated sludge treatment process.
Google map
Client: Castelnaudary municipality -

Cluny Wastewater Treatment Plant
Complete project design and supervision services for the construction of a new wastewater treatment plant (6500 PE): activated sludge and sludge dehydration on marcophyte beds. Effluent transfer.
Google map
Client: Cluny municipality -

Montceau-les-Mines Wastewater Treatment Plant
Management services on behalf of the Owner to ensure plant compliance with current standards (35,000 PE). Sludge and odour treatment.
Google map
Client: Communauté Urbaine du Creusot-Montceau -

Torcy et Blanzy Wastewater Treatment Plants
Complete project design and supervision services for the extension of wastewater treatment plants in Torcy (60,000 PE) and Blanzy (25,000 PE), as well as ensuring their compliance with current standards.
Google map
Client: Communauté Urbaine du Creusot-Montceau -

Le Touvet Wastewater Treatment Plant
Design, construction and supervision of Le Touvet wastewater treatment plant with a capaicty of 18,000 PE.
Google map
Activated sludge treatment, biological treatment of fats, solar drying of sludge.
Client: Syndicat d’Assainissement des Iles (SADI) -

Bourg-Argental Wastewater Treatment Plant
Complete project design and supervision services for the construction of a new wastewater treatment plant (4500 PE), activated sludge process and sludge treatment on macrophyte beds. Channelling of effluent transfer and pollution basin.
Google map
“Loi sur l’Eau” report (French legislation on water and the environment).
Client : Bourg-Argental district authorities -

Dijon-Longvic Wastewater Treatment Plant
Engineering services for water and sludge treatment processes. Reconstruction of the wastewater treatment plant (400,000 PE). Upgrading of water treatment process to be compliant with current standards.
Google map
Adaptation of sludge treatment process: thickening / stabilisation / dehydration / drying / incineration.
Partner: Sogreah
Client: Lyonnaise des Eaux -

Fourchambault Wastewater Treatment Plant
Engineering services to make the plant compliant with current standards (15,000 PE).
Google map
Activated sludge subjected to prolonged aeration, sludge centrifugation.
Effluent transfer. “Loi sur l’Eau” report (French legislation on water and the environment).
Client: Nevers local authorities -

Aquapole Wastewater Treatment Plant, Grenoble
Management of works contracts and assistance to the owner for acceptance formalities: extension of the biological treatment capacity of the plant.
Google map
Industrial effluent accounting for 1/5th of input.
Client: Grenoble Alpes Métropole (METRO) -

Marcigny Wastewater Treatment Plant
Complete project design and supervision services for the construction of Marcigny wastewater treatment plant (3400 PE).
Google map
Activated sludge and sludge dehydration on marcophyte beds prior to pumping.
Effluent transfer.
“Loi sur l’Eau” report (French legislation on water and the environment).
Client: Marcigny municipality