Drinking water

Drinking water: the natural resource par excellence. Many types of engineering assignments revolve around this resource, covering every stage of  the water cycle. Abstraction, treatment (even desalination), then distribution. We are on hand to provide expertise at all these stages, to help you think in terms of sustainable development, particularly by protecting and saving water resources at every opportunity.

References

Left Right
  • reservoir_communal_montchadou_sierg
    SIERG District Reservoirs

    Assessment and complete project design and supervision services for the rehabilitation of 60 reservoirs belonging to members of the SIERG district.
    Client: Syndicat Intercommunal des Eaux de la Région Grenobloise

    Google map
  • usine_eau_potable_polonia_levens
    Polonia Drinking Water Treatment Plant – Levens district

    Assistance to the Client for the rehabilitation or reconstruction of the 500 m3/h drinking water treatment plant. Photo: existing plant.
    Feasibility study – Civil engineering / geotechnical assessment.
    Lamellar settling tank / Sand filtration / Ozone treatment
    Client: Communauté Urbaine Nice Côte d’Azur

    Google map
  • reservoir_la_combe_gieres
    La Combe Reservoir, Gières

    Feasibility study for the creation of a new 15 m³ drinking water reservoir.
    Client: Gières municipality

    Google map
  • filtre_charbon_actif_usine_eau_potable_la_sorme
    La Sorme Drinking Water Production Plant

    Preliminary study + complete project design and supervision services + « Loi sur l’Eau » report (French legislation on water and the environment) with a view to  making La Sorme drinking water treatment plant (1000 m³/h) compliant with current standards. Sand bed and granular activated carbon filtering processes / Chlorination.
    Client: Communauté des Communes de Creusot-Montceau

    Google map
  • by_pass_canalisation_pre_grivel_sierg
    Pré-Grivel Water Main in Vizille

    Project design and supervision services for the replacement of the Pré-Grivel water main and its accessory equipment.
    Bypass between two 700 mm dia. pipes joining together in a single 1000 mm dia water main.
    Client: Syndicat Intercommunal des Eaux de la Région Grenobloise

    Google map
  • salle_commande_pompage_ jouchy1_sierg
    Rehabilitation of Jouchy 1 Water Well

    Project design and supervision services for the rehabilitation of the Jouchy 1 water well. Works to protect the Jouchy aquifer.
    Pumping station control room.
    Client: Syndicat Intercommunal des Eaux de la Région Grenobloise.

    Google map