Home › Areas of expertise › Water › Drinking water
Drinking water
Drinking water: the natural resource par excellence. Many types of engineering assignments revolve around this resource, covering every stage of the water cycle. Abstraction, treatment (even desalination), then distribution. We are on hand to provide expertise at all these stages, to help you think in terms of sustainable development, particularly by protecting and saving water resources at every opportunity.
References
Left
Right
-
SIERG District Reservoirs
Assessment and complete project design and supervision services for the rehabilitation of 60 reservoirs belonging to members of the SIERG district.
Client: Syndicat Intercommunal des Eaux de la Région Grenobloise
Google map
-
Polonia Drinking Water Treatment Plant – Levens district
Assistance to the Client for the rehabilitation or reconstruction of the 500 m3/h drinking water treatment plant. Photo: existing plant.
Feasibility study – Civil engineering / geotechnical assessment.
Lamellar settling tank / Sand filtration / Ozone treatment
Client: Communauté Urbaine Nice Côte d’Azur
Google map
-
La Combe Reservoir, Gières
Feasibility study for the creation of a new 15 m³ drinking water reservoir.
Client: Gières municipality
Google map
-
La Sorme Drinking Water Production Plant
Preliminary study + complete project design and supervision services + « Loi sur l’Eau » report (French legislation on water and the environment) with a view to making La Sorme drinking water treatment plant (1000 m³/h) compliant with current standards. Sand bed and granular activated carbon filtering processes / Chlorination.
Client: Communauté des Communes de Creusot-Montceau
Google map
-
Pré-Grivel Water Main in Vizille
Project design and supervision services for the replacement of the Pré-Grivel water main and its accessory equipment.
Bypass between two 700 mm dia. pipes joining together in a single 1000 mm dia water main.
Client: Syndicat Intercommunal des Eaux de la Région Grenobloise
Google map
-
Rehabilitation of Jouchy 1 Water Well
Project design and supervision services for the rehabilitation of the Jouchy 1 water well. Works to protect the Jouchy aquifer.
Pumping station control room.
Client: Syndicat Intercommunal des Eaux de la Région Grenobloise.
Google map